Analisis optimasi waktu dan biaya proyek pembangunan prasarana dan fasilitas bandara
Abstract
Keywords
References
A, A. H. (2005). Perencanaan dan Pengendalian Proyek dengan Metode PERT – CPM. Journal The Winners, 06(02), 155–174.
Abdullah, R., Maddeppungeng, A., & Pradipta, A. Y. (2014). Optimalisasi Waktu dan Biaya Dengan Project Crashing dan Tahapan Deterministik Least Cost Scheduling. Jurnal Fondasi, 03(01), 46–60.
Agyei, W. (2015). Project Planning And Scheduling Using PERT And CPM Techniques With Linear Programming. International Journal of Scientific & Technology Research, 04(08), 222–227. Retrieved from www.ijstr.org
Anastasiia, M., Vakhrushkina, A., Murgul, V., & Sazonova, T. (2016). Project Control on a Mutual Application of Pert and Earned Value Management Methods. Procedia Engineering, 165(01), 1812–1817. https://doi.org/101016/j.proeng.2016.11.927
Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek dalam Meningkatkan Efisiensi dan Efektifitas Sumber Daya Perusahaan. J@ti Undip: Jurnal Teknik Industri, 12(03), 189–196.
Assauri, S. (2016). Manajemen Operasi Produksi Pencapaian Sasaran Organisasi Berkesinambungan (03 ed.). Jakarta: Rajawali Pers.
Badan Pusat Statistik. (2018). Konstruksi Dalam Angka (Subdirektorat Statistik Konstruksi, Ed.).
https://doi.org/6301005
Boushaala, A. A. M. (2013). An Approach for Project Scheduling Using PERT/CPM and Petri Nets (PNs) Tools. International Journal of Modern Engineering Research (IJMER), 03(05), 3200–3206. Retrieved from www.ijmer.com
Dipoprasetyo, I. (2016). Analisis Network Planning dengan Critical Path Method (CPM) dalam Usaha Efisiensi Waktu Produksi Pakaian Batik Pada Butik "Omahkoe Batik" di Samarinda. EJournal Administrasi Bisnis, 04(04), 1002–1015. Retrieved from ejournal.adbisnis.fisip-unmul.ac.id
Fahmi, I. (2014). Manajemen Produksi dan Operasi. Bandung: Alfabeta.
Garg, A. (2016). Project Crashing Algorithm. Research Gate. Retrieved from https://www.researchgate.net/publication/310493482
Habibi, F., Birganib, O. T., Koppelaar, H., & Radenovićd, S. (2018). Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT). Journal of Project Management, 03, 183–196.
https://doi.org/doi: 10.5267/j.jpm.2018.4.002
Hadju, M., & Bokor, O. (2014). The Effects of Different Activity Distributions on Project Duration in PERT Network. Procedia- Social and Behavioral Sciences, 119, 766–775.
https://doi.org/10.1016/j.sbspro.2014.03.086
Haming, M., & Nurnajamuddin, M. (2011). Manajemen Produksi Modern. Jakarta: Bumi Aksara.
Haq, M. Z. ul, & Muhardi, S. (2016). Implementasi Critical Path Method (CPM) untuk Mengurangi Resiko Penjadwalan. Research Gate.
https://doi.org/DOI: 10.6084/m9.figshare.5732970
Heizer, J., & Render, B. (2005). Manajemen Operasi (07 ed.). Jakarta: Salemba Empat.
Husen, I. (2011). Manajemen Proyek (02 ed.). Yogyakarta: ANDI.
Karmaker, C. L., & Halder, P. (2017). Scheduling Project Crashing Time Using Linear Programming Approach. Int. J. Res. Ind. Eng, 06(04), 283–292. Retrieved from www.riejournal.com
Lermen, F. H., Morais, M. de F., Matos, C., Röder, R., & Röder, C. (2016). Optimalization of Times and Costs of Project of Horizontal Laminator Production Using PERT/CPM Technical. Independent Journal of Management & Production (IJM&P), 07(03), 833–853. https://doi.org/10.14807/ijmp.v7i3.423
Mas’ud, I. M., & Wijayanti, E. (2017). Analisis Evaluasi Biaya dan Penjadwalan Waktu Proyek Pengolahan Limbah PT.KI dengan Pendekatan PERT. Jurnal J-Ensitec, 03(02), 111–117.
Maulana, A., & Kurniawan, F. (2019). Time Optimization Using CPM, PERT and PDM Methods In The Social and Department of Kelautan Building Development Project Gresik District. IJTI (International Journal Of Transportation And Infrastructure), 02(02), 58–67. Retrieved from http://jurnal.narotama.ac.id/index.php/ijti
Mouhoub, Eddine, N., Abdlhamid, B., & Hocine, B. (2011). Mouhoub, Nasser Eddine, Benhocine Abdlhamid, Hocine Beloudah. A New Method for Constructing a Minimal PERT Network, Applied Mathematical Modeling, 35, 4575–4588.
Nigrum, F. G. A., Hartono, W., & Sugiyarto. (2017). Penerapan Metode Crashing dalam Percepatan Durasi Proyek dengan Alternatif Penambahan Jam Lembur dan Shift Kerja. E-Jurnal Matriks Teknik Sipil, 583–591.
Pastiarsa, M. (2015). Manajemen Proyek Konstruksi Bangunan Industri; Perspektif Pemilik Proyek. Yogyakarta: Teknosain.
Perrenoud, K. T. A. J. (2013). Implementing Project Schedule Metrics to Identify the Impact of Delays Correlated with Contractors. Journal for the Advancement of Perormance Information and Value, 41–49.
Prasetya, H., & Lukiastuti, F. (2011). Manajemen Operasi, Cetakan Pertama. Yogyakarta: CAPS.
Profession, P. P. (2015). Capturing the Value of Project Management. Pulse of the Profession®. Retrieved from PMI.org/Pulse
Raharja, I. (2014). Analisa Penjadwalan Proyek dengan Metode PERT di PT. Hasana Damai Putra Yogyakarta pada Proyek Perumahan Tirta Sani. Journal Bentang, 02(01).
Sahid, D. S. S. (2012). Implementasi Critical Path Method dan PERT Analysis pada Proyek Global Technology for Local Community. Jurnal Teknologi Informasi Dan Telematika, 05, 14–22.
Stevenson, J. W. (2015). Operations Management (12th ed.). Retrieved from www.mhhe.com
Sugiyono. (2014). Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.
Supriyanti. (2013). Manajemen Produksi dan Operasi, Cetakan Pertama. Jakarta: Mitra Kreatif Solusindo.
Syahrizal, & Ridho, M. R. (2014). Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode PERT dan CPM (Studi Kasus : Proyek Pembangunan Gedung Kantor Badan Pusat Statistik Kota Medan Di Jl. Gaperta Medan, Sumatera Utara).
Tjakra, E. R. M. I. J., & Pratasis, P. A. K. (2016). Penerapan Metode CPM padaProyek Konstruksi. Jurnal Sipil Statik, 04(09), 551–558.
Yudaruddin, R. (2014). Statistik Ekonomi: Aplikasi dengan Program SPSS Versi 20. Yogyakarta: Interpena.
DOI: https://doi.org/10.29264/jimm.v7i1.7588
Refbacks
- There are currently no refbacks.
Copyright (c) 2022 Jurnal Ilmu Manajemen Mulawarman (JIMM)
Jurnal Ilmu Manajemen Mulawarman (JIMM)
Faculty of Economics and Business, Mulawarman University
Jl. Tanah Grogot No.1 Samarinda Kalimantan Timur 75119
Email: jimm.feb@gmail.com